Skip to content

EliteIncluded in the Elite package.

Create a change order

Propose a change to a confirmed job as its own document for your customer to sign, add it to the same job, and take work out with a credit.

A change order is a change to a confirmed job that your customer signs as its own document, with its own number and total. It is numbered after the original: the first change order to S00083 is S00083-1, the next S00083-2, and so on. It keeps the original’s customer, payment terms and checklist answers.

Who can do this: Sales, Office and Admin, from the contract order. Office and Admin can also start one from the job.

  1. In Sales, click Orders in the top bar and open the contract order. Click Create Change Order (1).

    A contract order with the Create Change Order button marked.

  2. The change order opens as a new proposal. Its number (1) is the original’s number with -1 after it, and the line under it (2) names the original. It starts with no lines. To draw the change instead of adding lines, use Draw Change (3). See Draw the change.

    A new change order showing its number, the line naming the original, and the Draw Change button marked.

  3. Switch Proposal Description off (1) so your customer sees the lines. If your company shows a description in place of the lines, it starts on, and the change order can’t be previewed or sent until you write the description.

    Click Add Line, pick the item and set its quantity (2). Here it is two Wood Corner Posts. Click the cloud icon (3) to save. The change order’s total is the change alone.

    The change order with Proposal Description switched off, a new Wood Corner Post line and the save icon marked.

Everything your customer sees is titled Change Order.

  1. Click Send. The email’s subject reads Change Order with the change order’s number (1), and the PDF attached is the change order (2). Click Send (3).

    The Send email for a change order, with the subject, the Change Order PDF and the Send button marked.

    The PDF is titled Change Order # with its number, and its Changes entry names the original proposal.

  2. Your customer’s page reads Change Order for and their name (1). They accept and sign it with Accept & Sign (2), the same way as any proposal.

    The customer’s page for a change order, with the Change Order heading and the Accept & Sign button marked.

The original contract order has a Change Orders button (1) with the number made so far. Click it to list them, with each one’s total and status.

The original contract order with the Change Orders button marked.

When the change order is confirmed (your customer signs it, or you click Confirm), it becomes a contract order on the original’s job. No second job is made.

  1. Open the job. Office and Admin can start another change order here with Create Change Order (1). The Sales button (2) counts the original and its change orders, and its total includes them.

    A job’s header with the Create Change Order button and the Sales button marked.

  2. Click Sales to see the original and each confirmed change order (1).

    The job’s Sales list showing the change order and the original, both contract orders.

The job’s Costs tab counts the change order’s items with the original’s.

You can draw the change instead of adding lines. Draw only the new fence, not what is already there.

  1. On a new change order, click Draw Change. The drawing tool opens on the job’s site with an empty map.

  2. Pick the fence and draw the new run, as in Draw a fence. Then click Update Proposal (1). Click OK when asked This will update the order lines from the drawing….

    The drawing tool with one new 84 ft run drawn and the Update Proposal button marked.

  3. The change order now holds the drawn run’s lines (1). Draw Change is replaced by View Drawing.

    The drawn change order with its fence run lines marked.

To take something off the job, give the line a minus quantity.

  1. On a new change order, Add Line with the item and a minus quantity (1). Here it is two wood panels at -2. The amount (2) and the change order’s total are below zero.

    A change order line with a quantity of -2 and its negative amount marked.

  2. Send it and have it signed, or click Confirm. Then Office or Admin clicks Create Invoice (1).

    The confirmed change order with the Create Invoice button marked.

  3. It makes a draft Customer Credit Note (1) for the amount taken off (2). Check it, then click Confirm.

    A draft customer credit note with its title and total marked.