Skip to content

Set up your proposal checklist

Write the questions every proposal asks, choose which ones must be answered, and see them on a proposal's Checklist tab.

The proposal checklist is your list of questions for every job: which way the gate swings, the color, whether a permit is needed. Every active question appears on the Checklist tab of new proposals and prints on the proposal PDF. A required question has to be answered before the proposal can become a Contract Order.

Who can do this: Admin.

A short video of this guide. The steps on this page are the full instructions.
  1. In System, open Proposals (1) › Checklist Items and click New (2).

    The Proposal Checklist list, with the Proposals menu and the New button marked.

  2. Fill in the question:

    A new checklist question, with Label, Type, Required, Help Text and its choices marked.

    • Label (1): the question, as your team will read it.
    • Type (2): Checkbox, Text or Dropdown.
    • Required (3): the proposal cannot become a Contract Order until this is answered.
    • Help Text (4): a hint shown beside the question on the proposal.
    • For a Dropdown, click Add a line under Option (5) once for each choice and type it.
  3. Click the cloud icon at the top to save.

On a new proposal, open the Checklist tab (1). Checklist is set to YES (2), and every question is listed with its help text (3). Your team answers each one on its line: the Done switch for a checkbox, Text for a text question, Choice for a dropdown. Then they save the proposal.

A proposal’s Checklist tab, with the tab, the YES/NO choice and the new question marked.

If someone clicks Confirm while a required question is unanswered, the proposal stays a proposal and a message lists the questions still to answer:

The message saying the proposal cannot become a Contract Order because a required checklist item is unanswered.

Answer it on its line and save the proposal.